Compare electrical quotes against the same written scope:
the work and locations, specified materials, appropriate testing,
documentation and the finish left behind. Ask each provider to
identify exclusions, assumptions and how additional work would
be agreed. A lower total is only meaningful once you understand
whether both proposals cover the same result.
Two prices for “electrical work” can describe different jobs.
One may cover investigation, another an agreed installation.
One may include filling cable routes while another leaves
decoration to you. For a London home or flat, the useful
comparison is what will be completed, checked and handed over
for the stated price.
1. Give every provider the same starting scope
List the intended work, quantities, locations and desired
outcome. Distinguish replacing an existing item from adding
a new one. If the cause of a fault has not been established,
ask what the initial investigation covers rather than treating
an assessment charge as a complete repair price.
Electrical Safety First recommends a written summary of the
work and, unless the task is minor, obtaining at least three
written quotes. It also advises checking the electrician's
registration. See its
guidance on choosing an electrician [1].
These are useful checks alongside the scope comparison;
the lowest price alone does not establish suitability.
If you need help describing symptoms, access or existing
records, use
Booking Electrical Work: What Should You Tell the Electrician?
Send the same relevant information to each provider and flag
any changes so their proposals remain comparable.
If one proposal is for a condition report and another for
a repair, first clarify which outcome you need. The guide to
electrical repair, inspection or new installation
explains that choice. Do not compare different services as
though they are interchangeable.
2. Ask what testing and documentation cover
“Testing included” needs context. Ask whether it concerns the
work being installed or altered, investigation of a reported
fault, or inspection of the wider existing installation.
Ask the electrician to explain what will be checked, what
record will be provided and any limits on the scope.
Installation certification and an Electrical Installation
Condition Report are different documents. The appropriate
installation record may be an Electrical Installation
Certificate or a Minor Electrical Installation Works
Certificate, depending on the work. An EICR concerns the
condition of the existing installation. Do not assume that
paying for one automatically includes the other.
Electrical Safety First's
building regulations guidance [2]
explains installation certification and Building Regulations
compliance documentation. For work in England,
Approved Document P [3]
covers electrical safety in dwellings, including guidance on
notification. Ask who will handle any applicable notification
and whether related costs are included; requirements depend
on the actual work.
Do not seek a cheaper version by removing appropriate safety
checks. If testing identifies an existing defect outside the
proposed work, the quote should explain how the finding will
be reported and how any additional work will be discussed.
3. Compare the materials actually specified
“Supply and fit” does not tell you which product, finish or
quantity is included. Ask for sufficient detail to identify
the proposed accessories or fittings and distinguish a
confirmed item from an allowance awaiting selection.
Compare the same specification where possible; an unexplained
difference is a question to resolve, not evidence of poor value.
-
Visible products:
confirm the type, quantity, finish and any agreed model
or range.
-
Installation materials:
clarify whether the necessary cabling, containment,
fixings and other materials for the agreed work
are included.
-
Customer-supplied items:
ask the electrician to confirm suitability before
purchase or fitting, and explain what happens if
an item is incompatible or incomplete.
-
Substitutions:
agree how alternatives will be approved if the specified
item is unavailable.
Leave technical selection to the competent electrician.
The purpose of a specification is to understand what is priced,
not to select cable sizes or protective devices yourself.
If a product allowance may change, ask how the final selection
will affect the total.
4. Define what “making good” means
Making good concerns the surfaces or finishes disturbed by
the work. The phrase alone does not establish whether a wall
will be filled, plastered, sanded, painted or left ready for
another trade. Ask the provider to describe the finished
condition in plain language.
For work involving a cable route, clarify whether the proposal
assumes surface-mounted containment or access through walls
or floors. Then ask which reinstatement tasks are included,
who will carry them out and whether another visit is needed.
The agreed route and access method can change the amount
of finishing involved.
Useful questions include: “Will the opening be filled only,
or finished ready for decoration?” and “Is repainting limited
to the repaired area, or is it excluded?” Also clarify
protection of nearby surfaces, removal of work-related debris
and reinstatement of any floor covering that must be disturbed.
Do not assume any of these is part of a provider's
standard package.
An example without invented prices
Two proposals might both mention adding a socket. One assumes
a surface route and excludes decoration; the other assumes
a concealed route with specified plaster repairs. Their
totals cover different methods and finishes. Ask whether
both methods are suitable, choose the intended result,
then request comparable wording before judging the
price difference.
5. Compare each proposal line by line
Use a simple comparison sheet. Record “not stated” where
information is missing and ask for clarification; a blank
does not prove that an item is included or excluded.
On a narrow screen, scroll the table sideways if needed.
Questions to resolve before comparing totals
| Item |
What should be clear? |
| Work and locations |
Defined tasks, quantities, rooms and any
investigation stage.
|
| Materials |
Specified products, allowances, supply
responsibilities and substitutions.
|
| Testing and records |
Checks relevant to the work, intended
documentation and applicable notification
arrangements.
|
| Access and finishing |
Route assumptions, access work, reinstatement
and the final surface condition.
|
| Visits and exclusions |
What attendance is included and what would
need another agreement.
|
| Price basis |
Fixed scope or estimate, any allowances,
VAT treatment and additional charges
where applicable.
|
| Changes and payment |
How extra work is authorised, payment stages
and how long the proposal remains valid.
|
6. Confirm changes and handover in writing
Before accepting, ask for unresolved points to be incorporated
into the proposal. Keep the agreed scope, exclusions and any
later amendments together. A conversation about a different
fitting or extra task should result in a clear record of the
change and its effect on price and timing.
Clarify what happens if concealed conditions prevent the
planned work proceeding. Ask how the electrician will
communicate findings and seek agreement for additional work,
while addressing any immediate safety concern appropriately.
Avoid an open-ended assumption that every extra task is
either included or automatically authorised.
At handover, confirm what was completed, which records will
be supplied and whether any items remain outstanding.
Discuss the process for reporting a concern after completion.
Do not infer a guarantee, free return visit or decorative
repair from silence in the quote.
Discuss the scope of your electrical work
For Fixin4u's
electrical services,
explain the intended work and finish, then ask what assessment,
materials, testing and documentation the proposal includes.
Confirm the actual terms and availability for your enquiry.